FTBF operations

Data taking instructions

ACNET (beam profile) monitor

DRS4 controls

Dark Box + DRS4 setup at MT62D FTBF

Moving Table Control (SCL_Utility_202.6.34A.exe)

  • mteststand-v (131.225.176.95)
  • mteststand-h (131.225.176.100)
  • Command Reference
    • FH2 - home (0,0)
    • FP XXXXXX = = goto position
    • EP query current position
      • Working position - vertical 410000, horizontal 250000; 20K/inch

Camera Control - 131.225.176.26

Pictures

  • Top - Aview from the top, a small 3x3 couter in the beam

operating HV -1700V

  • Right - Scint trigger counters ( Operating HV~1600V
  • Bottom - NimPlus Setup
  • Dark Box with Scint. Cell
  • Dark Box inside
  • Tile Stand Assembly
  • Tiles
  • PikoAmpermeter (top) - Operation button (OPER) - ON/OFF
  • PowerSupply(bottom) - Press 6V button , then - Output ON/OFF
    • SiPM Bias Voltage - 54V; resistance 12 k\Omega
  • FTBF tracker
  • DRS4inTracker


Page last modified on January 15, 2020, at 04:42 PM EST

|--Created: Sergey A. Uzunyan -|- Site Config --|