⚠ (:notitle:)
FTBF operations
Data taking instructions
ACNET (beam profile) monitor
DRS4  controls
Dark Box + DRS4 setup at MT62D FTBF
- mteststand-v (131.225.176.95)
 - mteststand-h (131.225.176.100)
 - Command Reference
- FH2 - home (0,0)
 - FP XXXXXX = = goto position
 - EP query current position
- Working position -  vertical 410000, horizontal 250000; 20K/inch
 
  
   
 | 
 | 
Pictures
- Top - Aview from the top, a small 3x3 couter in the beam
 
 operating HV  -1700V
 - Right - Scint trigger counters ( Operating HV~1600V
 - Bottom - NimPlus Setup
  
 | 
 | 
- Dark Box with Scint. Cell
 
  | 
 | 
| 
 | 
 | 
| 
 | 
 | 
| 
 | 
 | 
- PikoAmpermeter (top) - Operation button (OPER) - ON/OFF
 - PowerSupply(bottom) -  Press 6V button , then -  Output ON/OFF 
- SiPM Bias Voltage - 54V; resistance 12 k\Omega
 
  
  | 
 | 
| 
 | 
 | 
| 
 | 
 |