Minutes of A0 photoinjector (local) meeting Friday April 16th, 2004 * attendees: Daniel, Jamie, Matt, Yin-E, Rodion, Kai, Markus, Nick, and Philippe * Next meeting: Friday April 23th 4pm in "the Motel" * Plan for next week: -Monday: - North cave is running. - work on laser [Rodion] - install lead shield around all CCD [Jamie] -Tuesday: - Round beam studies [Kai] - Flat beam start-up [Yin-E] -Wednesday: - Flat beam [Yin-E/Philippe] -Thursday: - morning: Round beam studies at X3 [Philippe] - afternoon: Plasma experiment [Matt et al.] -Friday: - Plasma experiment [Matt et al.] Discussions: * Achievements of last week: - Monday: - laser down due to chiller problem - in parallel to chiller repair activities, the interlock group installed an interlock on the rf switch that will enable the operation of north cave (polarized rf-gun) without having to lock the south cave (A0 bunker) - Tuesday: - start-up injector, tried to do some measurement on longitudinal dynamics with the probe/witness pulses, the oscillator was very unstable and the data taken are poor quality [Rodion, Adrian, Philippe] - Wednesday: - took some more data on 9-cell T-matrix -- part of the shift we had problem with beam beam jitter due to oscillator still unstable [Philippe/Yin-E] - Thursday: - CTR bunch length and streak camera measurements [Daniel, Nick] - afternoon: Plasma [Matt et al.]: beam was transported in the new beamline (bigger diameter pipe + stronger quads). However the charge transmission up to the plasma chamber is poor ~50-60%. This is believe to be due to scattering in the aluminum window. - Friday - Work started Thursday afternoon continued, but was then interrupted due to a chiller problem that prevented operation of the two-pass laser amplifier ----------------------------------------- * Tasks concerning hardware H8/ calibration of upstream directional coupler and insulator (Markus need to speak to Tim and with Kai to schedule this STATUS?) H11/ Some of the toroid need cabling to have signal available out of the cave in the rack area (JAMIE, STATUS?) H13/ Pulse stacker, what do we do? (Rodion) H14/ air coil steerers, Kai will gather all the paper he has and we will decide whether we can give this project to one of the NIU engineering student (Kai, STATUS: nobody at NIU picked up this project...) H20/ what shall we do with the burnt doubling crystal? Who will specify + order it? CRYSTALS REPLACED APRIL 2ND H21/ the laser uniformity problem can this be due to the new (since late summer) tight focusing in the doubling crystal area to improve conversion efficiency? H23/ laser spare components list (Jamie, RECEIVED A FIRST VERSION JAN-30-2004) -- NEED RODS H25/ Software for the digital camera (Jason) H26/ trigger problem on a couple of CCD camera (->Kai will look into it 03/2004) H27/ The temperature sensors on the laser components need to be wired and archived on ACNET (Jamie 03/26/04) H28/ Problem with emittance measurement at X7 (Philippe 04/16/04)