ACTION ITEM updated: Mon Feb 21 10:45:52 CST 2005 H8/ calibration of upstream directional coupler and insulator (Markus need to speak to Tim and with Kai to schedule this STATUS?) H13/ Pulse stacker, what do we do? (Rodion) H21/ the laser uniformity problem can this be due to the new (since late summer) tight focusing in the doubling crystal area to improve conversion efficiency? On going work [Rodion] H33/ laser fluctuation since June 1st week [FIXED?] H34/ Need more work on power supply + devise a way to measure the current being put out to the magnet [Jamie] H36/ laser room/table vibration studies [Rodion] write up available [DONE} H39/ streak camera new optics for plasma OTR and UV laser streaking. [Jamie, Greg, Rodion, Philippe] UV works need to test OTR H40/ installation of UIUC experiment, beamline design [Philippe] H41/ OTRI experiment [Greg] H42/ revisit EO sampling experiment [Jianliang] H43/ laser cooling system upgrade [Jamie-> discuss with Adrian, Jianliang,Rodion Req written up -> Helen] H44/ do we need to get our rf system out of the TeV LCW and Why [Jamie/Philippe] H45/ O-scope floppy disk [Jamie] H46/ dying gun klystron [Tim K.->John Reid] #.46